Optimal vehicle-dispatch decisions for cement silos using a fuzzy

Product Related Information

  • uceindia.com

    Important Link. FAQ's; Site Map; Contact Us. Address: Universal House, Warje Naka,Pune – 411029, Maharashtra, India. Toll free No.: 18002331777 Phone No.:+Kefid23 0777 Email: [email protected] replica watches replica watches uk; Subscribe. Subscribe to our email newsletter to receive our news, updates and awesome free files.

    GET A QUOTE
  • pecdev, Author at PEC Consulting Group - Page 2 of 3

    Geographical information systems (GIS) provide the framework to integrate the relevant exploration parameters for the targeted mineralization occurrence, such as geology, geochemistry, geophysics, land use, etc. (Fig. 1), processed by spatial data analysis techniques (weights of evidence, logistic regression, fuzzy logic, location–allocation

    GET A QUOTE
  • Optimal vehicle-dispatch decisions for cement silos using

    Download Citation | Optimal vehicle-dispatch decisions for cement silos using a fuzzy multi-objective approach | In real dispatch problems for cement-silo trucks, input data or parameters, such as

    GET A QUOTE
  • Decision-Making in a Fuzzy Environment | Management Science

    Nov 28, 2017 · Fuzzy goals and fuzzy constraints can be defined precisely as fuzzy sets in the space of alternatives. A fuzzy decision, then, may be viewed as an intersection of the given goals and constraints. A maximizing decision is defined as a point in the space of alternatives at which the membership function of a fuzzy decision attains its maximum value.

    GET A QUOTE
  • A survey on smart grid technologies and applications

    Feb 01, 2020 · Hybridization of electric vehicles and associations to the utility grid conquers the limitations of their use including battery weight/size, cost and short range of application. PHEV offers an alternative to substitute the use of petroleum based energy sources and to reduce overall emissions by using a mix of energy resources.

    GET A QUOTE
  • Volume-8 Issue-4 - International Journal of Recent

    Oct 29, 2020 · Solving Economic Load Dispatch Problem using Grey Wolf Optimizer Method: 123. Authors: C. Shajitha Begum, A. Ibrahim: 689-693: Paper Title: Fuzzy Positive Implicative and Fuzzy Associative WI-Ideals of Lattice Wajsberg Algebras: 124. Authors: Mohammed A Sabri Alrawi, Ganthan Narayana Samy, RCM Yusoff, B. Shanmugam: 694-699: Paper Title

    GET A QUOTE
  • Optimal vehicle-dispatch decisions for cement silos using

    Mar 16, 2012 · This work presents a novel fuzzy multi-objective linear programming (FMOLP) model that solves the cement-silo vehicle-dispatch problem in a fuzzy environment. This model is applied to solve multi-source, multi-product, multi-vehicle, and multi-ready-mixed-concrete (RMC) plant vehicle-dispatch problems with imprecise goals, input data, and parameters.

    GET A QUOTE
  • Role of optimization algorithms based fuzzy controller in

    Jul 30, 2020 · Ranjani, M. & Murugesan, P. Optimal fuzzy controller parameters using PSO for speed control of Quasi-Z Source DC/DC converter fed drive. Appl. Soft Comput. 27, 332–356 (2015).

    GET A QUOTE
  • International Journal of Production Research: Vol 52, No 4

    Cement Storage Silo - Zimmerman Industries, Inc.

    GET A QUOTE
  • Cement Plant OPERATIONS HANDBOOK For Dry Process Plants

    Silos for most materials are prone to developing dead material which is both wasteful of capacity and misleading as to inventory. This is a particular problem with cement. Periodically silos should be examined and cleaned, either manually from inside or using the various remotely controlled mechanical techniques now available (ICR; 6/1991, pg 56).

    GET A QUOTE
  • Prof. Ir. Sani Susanto, M.T., Ph.D., CRMP., IPU., AER

    Optimal vehicle-dispatch decisions for cement silos using a fuzzy multi-objective approach Tai-Sheng Su 1 July 2013 | International Journal of Production Research, Vol. 52, No. 4

    GET A QUOTE
  • Carlos Augusto Santos Silva | Instituto Superior Técnico

    Optimal electricity dispatch on isolated mini-grids using a demand response strategy for thermal storage backup with genetic algorithms more by Carlos Augusto Santos Silva ABSTRACT The present study uses the DHW (domestic hot water) electric backup from solar thermal systems to optimize the total electricity dispatch of an isolated mini-grid.

    GET A QUOTE
  • Recent development on the uses of alternative fuels in

    Apr 01, 2015 · The different cement types have to be stored separately in cement silos prior to bagging and dispatch. 2.6 Alternative fuels are cheaper than the fossil fuels which lead the cement industries to use them in optimal proportion. Authors suggest that multi-criteria analysis for decision making using AHP Fuzzy logic can be applied in

    GET A QUOTE
  • Cement Plant OPERATIONS HANDBOOK For Dry Process Plants

    Silos for most materials are prone to developing dead material which is both wasteful of capacity and misleading as to inventory. This is a particular problem with cement. Periodically silos should be examined and cleaned, either manually from inside or using the various remotely controlled mechanical techniques now available (ICR; 6/1991, pg 56).

    GET A QUOTE
  • DeepL Translate: The world's most accurate translator

    Translate texts & full document files instantly. Accurate translations for individuals and Teams. Millions translate with DeepL every day.

    GET A QUOTE
  • A Novel Fuzzy Model Predictive Control of a Gas Turbine in

    The complex characteristics of the gas turbine in a combined cycle unit have brought great difficulties in its control process. Meanwhile, the increasing emphasis on the efficiency, safety, and cleanliness of the power generation process also makes it significantly important to put forward advanced control strategies to satisfy the desired control demands of the gas turbine system.

    GET A QUOTE
  • (PDF) Load Frequency Control In Power System | Md. Al-Amin

    The dependency of In an electric power system, Load Frequency frequency is on active power whereas that of Control (LFC) is a system to maintain reasonably voltage is on the reactive power (Load Frequency uniform frequency, to divide the load between Control (LFC), 2013). The combination of active the generators and to control the tie-line

    GET A QUOTE
  • An optimization model of cross-docking scheduling of cold

    Su T.S., Vehicle Dispatching Problem with Weighted Additive Fuzzy Multi-Objective Approach: A Case Study from the Cement Silos, International Journal of Information and Management Sciences 30(1) (2019), 17–36. [14] Bansal S., Goel R.K. and Katiyar V.

    GET A QUOTE
  • Prefabricated components - Foundations, WOLF System

    Rapid and largely weather-independent installations allow a shortening of the construction period. High load capacity, noise and fire protection properties, a smooth visible surface, long life and low maintenance are other advantages.

    GET A QUOTE
  • Analysis of Failures and Influence Factors of Critical

    Metro plays an indispensable role in promoting social and economic development of the big cities. However, the safety operation of the metro system is believed to be an arduous work for its operation being susceptible to various factors, especially equipment failure, which could bring about delay, interruption, and even accidents. In consideration of the seriousness of metro accident, it is

    GET A QUOTE