Safely Setting Concrete Boom Pump Outriggers Concrete

Product Related Information

  • Guidance on Safety in Concrete Pumping

    Health and Safety Authority Guidance on Safety in Concrete Pumping 5 Cy an 100 Magenta 76 Ye llow 0 Black 27 2.0 Definitions (Cont'd) 2.17 Receiving Hopper: The area into which the mixed concrete is discharged prior to being pumped into position. 2.18 Remote Control Box: A portable control panel which is connected to the concrete pump by a wired

    GET A QUOTE
  • operation manual concrete pump

    - 4 - operation manual concrete pump.doc 1 Description 1.1 Description of main components 1 Subframe 2 Frame connection for boom base 3 Pedestal, reling and ladder 4 Boom support 5 Pump unit with main control block 6 Concrete delivery pipeline 7 Additional water tank with water pump 8 Boom base with outrigger 9 Control panel 10 Distributor boom

    GET A QUOTE
  • Case Study | AJ's Concrete Pumping | Outrigger Pads for

    Dec 08, 2018 · AJ's Concrete Pumping, Vancouver, B.C. | Scott Sutherland, Operations Manager. The Customer's Business. AJ's Concrete Pumping, a division of Sutherland Concrete, operates a fleet of Putzmeister truck-mounted Z-boom pumps ranging from 58- to 24-meter, as well as High-Pressure Line Pumps.Since the mid-1970s, the company has provided placing and finishing services for high-end …

    GET A QUOTE
  • Safe support of mobile plant guide - WorkSafe.qld.gov.au

    be pressured into setting the mobile plant up unless it is safe to do so. The hirer and/or principal contractor also have a duty to ensure that the mobile plant can be safely set up. Photograph 4: Concrete placement boom overturned when the boom slewed over short legged outriggers on one side of the vehicle. Risk management

    GET A QUOTE
  • Safely Setting Concrete Boom Pump Outriggers| Concrete Constru…

    Here are some rules to follow when setting outriggers

    GET A QUOTE
  • Safety Bulletin Outriggers - American Concrete Pumping

    Concrete Pump Hazards & Safety - The Concrete Network

    GET A QUOTE
  • Schwing US: Outrigger Systems

    This allows concrete pumps with H-outriggers to work in locations where other concrete pumps cannot be set-up. In addition, there is plenty of storage space for accessories and hoses on both sides thanks to the rear H configuration. SCHWING truck-mounted concrete pumps with H-outriggers at the rear: S 24 X, S 28 X, S 31 XT, S 36 X, S 39 SX

    GET A QUOTE
  • Setting up Concrete Pumps| Concrete Construction Magazine

    Feb 12, 2014 · Setting up concrete pumps for safety and productivity. Of all the equipment that has changed concrete construction over the past 40 years, the concrete boom pump is number one for increasing productivity and reducing labor. While buckets and buggies are still used in some situations, they have become rare on modern concrete projects.

    GET A QUOTE
  • Keeping Safe While Pumping | For Construction Pros

    Oct 16, 2008 · Keeping Safe While Pumping. Contractors who use concrete pumps on the jobsite can lower the incidence of a host of manual labor-related safety issues. Outriggers should be set up on a …

    GET A QUOTE
  • Safe Concrete Pump Setup Will Help Prevent Tip Overs and

    boom is one of the most critical jobs of the concrete pump operator and should always be done in accordance with the manufacturer's recommended procedure. If not done properly, it can lead to a serious accident. Setting outriggers . When arriving at the jobsite, always check-in with the contractor. Talk with the superintendant or foreman regarding where to set up safely. The contractor needs to supply a safe set-up …

    GET A QUOTE
  • Audit guide CONCRETE PUMPS - myosh.com

    Jul 31, 2009 · If it is a mobile boom pump, does it have current plant registration? 9. Does the operator hold a current ticket for the operation of a mobile concrete placing boom? 10. Does the truck have a Queensland Modification Plate (Blue Plate) fitted? This is usually fixed to the inside of either door. 11.

    GET A QUOTE
  • Schwing: Outrigger systems

    boom is one of the most critical jobs of the concrete pump operator and should always be done in accordance with the manufacturer's recommended procedure. If not done properly, it can lead to a serious accident. Setting outriggers When arriving at the jobsite, always check-in with the contractor. Talk with the superintendant or foreman regarding where to set up safely. The contractor needs to supply a safe set-up …

    GET A QUOTE
  • 61 Meter Concrete Boom Pump - ltconcretepump.com

    61 Meter Concrete Boom Pump. The 61 meter concrete pump meets the demands of large-scale construction, like shopping malls, theatres, and gymnasiums. Luton has upgraded the 61 meters placing boom concrete pump truck to achieve high monitoring performance.

    GET A QUOTE
  • Safe Concrete Pump Setup Will Help Prevent Tip Overs and

    May 29, 2015 · Safe Concrete Pump Setup Will Help Prevent Tip Overs and Electrocutions. Do not set outriggers on uneven soil or a hill, and never bridge cribbing over a hole. Before pumping, the operator should slowly extend the boom over each outrigger. This allows a contractor to see if the outrigger is sinking into the ground, which could cause the

    GET A QUOTE
  • Two workers struck by concrete placing boom when pumper

    the scheduled start time. The pump operator began the set-up of the pump unit by parking the concrete pumper truck on a ramp and placing several pieces of wood (dunnage) on the ground in preparation for setting the outrigger bases. The outriggers and support …

    GET A QUOTE
  • 63Z-METER 63Z-METER TRUCK-MOUNTED CONCRETE BOOM …

    • Integrated 206 gallon (780L) water tank in outrigger 63Z-METERTRUCK-MOUNTED CONCRETE BOOM PUMP STANDARD FEATURES | The PRO-VANTAGE® Warranty Plan extends the coverage on all Putzmeister BSF boom pumps for a total of 36 months or 6,600 hours at no extra charge. Domestic only.

    GET A QUOTE
  • The Do's And Dont's Of Concrete Pumping - Allied Insurance

    Concrete pumping provides the fastest and most economical method for placing concrete on construction jobs. However, the process is not without danger and often presents numerous hazards. To prevent accidents on the job, these do's and don'ts of concrete pumping should always be on your mind.

    GET A QUOTE
  • Setting outriggers - American Concrete Pumping …

    Safely Setting Concrete Boom Pump Outriggers| Concrete

    GET A QUOTE
  • 🥇Concrete Pumping Contractor Descanso, Cement Pumping | 🥇

    Many construction sites are uneven, and setting a concrete boom pump up in an area that isn't level, or using it next to an excavated or sloped area, creates a much greater risk for tip-over. A good rule of thumb is to ensure that the outrigger is one foot from the edge of the drop-off for every foot of vertical drop. If an operator is setting up next to a six-foot-deep excavation, the outrigger should be at least six feet …

    GET A QUOTE
  • Industry standard: Concrete pumping - WorkSafe

    how to prepare for concrete pumping works, including working out the role of the principal contractor, concrete pumping contractor and equipment hirer, and providing employee training and supervision how to set up the worksite, including arrivals, pump and boom set-up, outriggers, checking for overhead powerlines and creating an operational

    GET A QUOTE